ON-LINE CELL BI-PASS MODULE A proprietary item of Instant Solutions
An excellent invention of Instant Solutions
After a long survey on battery maintenance we, M/s Instant Solutions have invented how to bi- pass or insert a lead acid cell from/in a battery bank under operation without interruption of load or charging.
In a battery bank where many nos. of cells are used, requirement of replacement of one cell may arise. However during operation in a plant it is very difficult to get the battery bank (used for critical application) isolated from the system. Without isolation of the bank it is not possible to replace the cell.
Our invention ensures you trouble free replacement of the cell from the battery bank and inserting another cell into the battery bank while the bank is under operation.
You test your batteries once in a year or once in two years. During capacity testing if you find minimum cell voltage from one cell then you terminate discharge testing. Why?
For one or two cells you are estimating the capacity of entire bank. Some times you stop discharge test, bi-pass the cell and again continue testing. Interruption during testing will not give you the right result.
Use ON-LNE CELL BI-PASS MODULE. Bi-pass the cell became weak without interruption of testing and continue up to your desired point. You will find better evaluation of your battery bank.
AVAILABLE STANDARD MODELS:
OCB-100
OCB-200
OCB-350
100 Amps (max.) in discharge direction and 20 Amps (max.) in charge direction
200 Amps (max.) in discharge direction and 20 (Amps (max.) in charge direction
350 Amps (max.) in discharge direction and 50 Amps max.) in charge direction